Client: Hydraulic Project Investment and Construction Management Board 4
Location: Vu Quang district, Ha Tinh Province
Objectives and Tasks:
- Exploiting Thạch Khê iron mine with flow rate of Q=6.0m3/s and other industrial zones.
- Irrigation for 32,585 hectares of agricultural land;
- Cultivate 5,991 hectares of aquaculture ( 3,500 hectares of freshwater and 2,491 hectares of brackish water).
- Power generation N = 15 MW.
- Water supply for other industries and domestic use; reduce floods and improve the lowland ecological environment (Q=4.0 m3/s); Develop tourism.
Main technical specifications
- Grade of works: grade II (Standard TCXDVN 285:2002)
- Capacity: 775×106 m³
- Main dam: Zoned earth-rock fill dam; Maximum height Hmax= 53.9m; Crest length L = 342m;
- Practical Profile Spillway of Ophiserope; Number of gates: 05
- Water intake No. 1: Supply water for irrigation with a flow rate Q = 56.8 m 3 /s, ensure environmental with a flow rate Q = 4.0 m 3 /s for combined power generation; divert construction flow with a maximum flood flow rate of approximately Q = 610 m 3 /s.
- Diversion tunnel and flood discharge during the construction phase and used as inspection and maintenance corridors during exploitation management; Tunnel diameter D = 7.0m;
- Water intake No. 2: supply irrigation water with design discharge Q design = 8.86 m 3 /s for Huong Son and Vu Quang canals.
- Hydropower plant:
- Number of units: 03
- Installed capacity: 15 MW
Total investment amount/Construction cost: 1,938 billion VND (2008)
Contract amount: 2,502,000,000 VND
Duration: 2009 ÷ 2017