Client:
- Hydraulic Project Investment and Construction Management Board 5
 
Location: Tay Hoa district, Phu Yen province
Tasks of Works:
- Water supply for irrigation of 2,500 hectares of agricultural land
 - Water supply for aquaculture: 800 hectares
 - Water supply for domestic use for 38,000 people
 - Combining flood mitigation, rural transportation, aquaculture, tourism and improving the ecological environment of the project area.
 
Main technical parameters
- Grade of Works: II
 - Storage capacity: 34.82 x 10 6 m³
 - Main dam: Earth dam, height H max = 29.7 m
 - Spillway : Piano key weirs with valve gate; Total design discharge Q p=1% = 1,705 m³/s. Gated spillway n x B = 3 x 9m; sill elevation +24.40m. Piano key weirs n x B = 2 x 15m; sill elevation +33.40m.
 - Water intake: Q design = 4.60 m³/s
 
Headlwork construction cost: 568,440,358,000 VND
Duration:
- Commencement: 2018
 - Completion: 2021
 