- Preventing saline intrusion caused by tides, sea-level rise, and storm surges, protecting 41,157 people with 10,728 hectares of land, of which 26,886 people with 4,810 hectares from District Road 16 to the coast;
- Provide favorable infrastructure to stabilize production, promote sustainable economic and social development and improve people’s lives in the project area;
- Combine the construction of a transportation route for rescue, disaster relief, and national defense and security.
- Grade of Works: III
- Dike route: Length 31.58km; sill elevation +3.50m; width of dike deck slab B = 5.0m; Dike body structure by compacted earth fill dams.
- Sluice through dike: includes 10 sluices with open gate type made of reinforced concrete, water clearing width from 5.0÷20.0m; 09 box culverts with dimensions of 1.5×1.5m and 2.0×2.0m
- Automatic two-way valve gate made of stainless steel
- Traffic bridge with load capacity HL13-X60.
Client:
Department of Agriculture and Rural Development of Ben Tre province
Location: Ba Tri district, Ben Tre province
Tasks of Works:
Main technical parameters
Total investment amount/Construction cost: 260 billion VND (in 2008. Viet Nam Government and Loan ODA)
Contract amount: 4,555,000,000 VND
Duration: 2008 ÷ 2012