Client:
- Hydraulic Project Investment and Construction Management Board 10
Location:
Kien Giang Province
Tasks of Works
- Controlling saltwater, fresh water and brackish water sources, creating production conditions for 384,120 hectares of natural land area in the provinces of Kien Giang, Hau Giang , Soc Trang , Bac Lieu and Ca Mau .
Main technical parameters
- Grade of Works: Cai Lon sluice is Grade I; Cai Be sluice is Grade II
Cai Lon Sluice



- Open sluice with width Bc=(11×40)=440m
- Flat valve gate operated by hydraulic cylinder
- Traffic bridge with load capacity HL93, B=9m
- Ship lock: B=15m, flap valve gate
Cai Be Sluice


- Open sluice with width: Bc=(2×35)=70m
- The flat valve gate operated by hydraulic cylinder
- Traffic bridge with load capacity HL93, B=9m
- Ship lock: B=15m, rectangular flap valve gate
Total investment amount/Construction cost: 3,309 billion VND
Duration:
- Commencement: 2019
- Completion: 2022