Client :
Department of Agriculture and Rural Development of Ba Ria-Vung Tau province
Location :
Chau Pha and Song Xoai communes of Tan Thanh district, Suoi Nghe, Binh Ba and Lang Lon communes of Chau Duc district, province
Tasks of Works:
- irrigation project for 2,773 hectares of Vegetables, Crops, Winter-Spring and Summer-Autumn rice crops for Chau Duc and Tan Thanh districts, providing additional water for the Dinh River dam to irrigate Long Dien districts and Ba Ria town. The project is currently supplying raw water to the Dinh River water plant with a flow of 120,000m3 per day and night.
Main technical parameters
- Grade of Works: III
- Storage capacity: 33,4×106 m3
- Dam: Homogeneous earth dam, height Hmax=22.5m, length 1.258km.
- Sluice: sill elevation of +38,5 m.
- Water intake: BxH (100×200)cm.
- Spillway: sill elevation: +39 m.
- Width of spillway B spillway = 15,5 m.
- Design discharge of spillway: Q spillway = 389,8 m3/s.
- Design spillway water column: H design = 6,27 m.
Total investment amount/Construction cost: 199.053 Billion VND (2000)
Duration:
- Commencement: 1997
- Completion : 2004