Client: Hydraulic Project Investment and Construction Management Board 8
Location: DakLo and DakLe streams in Loc Ngai and Loc Duc communes, Bao Lam district, Lam Dong Province
Objectives and Tasks:
- The two headworks Dak Long Thuong and Dagle reservoirs, of the Dak Long Thuong Water Resources Project have the following functions:
- Irrigation: Irrigating 3,689 hectares of industrial crops, including:
- Dak Long Thuong Reservoir: Gravity irrigation: 2,276 hectares; Supplementary Source irrigation: 800 hectares
- Dagle Reservoir: Gravity irrigation: 333 hectares; Supplementary source irrigation: 280 hectares
- Domestic water supply: Supplying water for 3,000 people with a standard of 60l/person/day and night.
- Maintaining a downstream flow of 0.045 m³/s during the dry season.
- Additional functions: Flood mitigation, aquaculture, environmental improvement, and tourism development
- Irrigation: Irrigating 3,689 hectares of industrial crops, including:
Main technical specifications:
- Grade of works, Storage capacity:
- Dak Long Thuong Reservoir: grade II. Storage capacity: 11.663×106m3
- Dagle Reservoir: grade III. Storage capacity: 2.301×106m3
- Dak Long Thuong Reservoir: Earth-fill dam with two zones, maximum height Hmax=37.2m, dam length 340m
- Dagle Reservoir: Homogeneous earth dam, maximum height Hmax=15.6m, dam length 200m.
Water intake:
- Dak Long Thuong Reservoir: Crest elevation: 881.75m. Lc=159.35m , sluice demension Þ100cm, Qdesign=1.72m3/s
- Dagle Reservoir: Crest elevation: 875.0m. Lc=64.0m, sluice demension Φ60cm, design discharge Qdesign=0.36m³/s.
Spillway:
- Dak Long Thuong Reservoir : free spillway with labyrinth weir, connected to a sloping apron and bottom energy dissipators. Constructed of M200 reinforced concrete. Physical width Bspillway=18.0m, effective width Beffective =38.0m; Design discharge Qdesign=116.13m³/s.
- Dagle Reservoir: free spillway with labyrinth weir. Followed by a stilling basin and a 40m long canal connected to a sloping apron. bottom energy dissipators, constructed of M200 reinforced concrete. Physical width Bspillway=8.0m, effective width Beffective=14.0m; Design discharge Qdesign=23.13m³/s.
- Total investment amount/Construction: 438.798 billion VND (First Quarter of 2009)
- Duration:
- Commencement: 2008
- Completed: 2011