Client: Southern Hydropower Joint Stock Company (SHP)
Location: Bao Lam District, Lam Dong Province.
Objectives and tasks:
- Supplying electricity to the national grid.
- In addition, during the dry season, the project also supplements irrigation water for the downstream area and participates in regulating water resources, thereby increasing the output of Dong Nai 8 and Tri An Hydropower plants. At the same time, the project also creates conditions for socio-economic development in the locality and develops tourism in the area
Main technical specifications
- Grade of works: II
- Storage capacity: 56.3×106m3
- Main dam: Concrete dam; Maximum height Hmax= 54.0 m; Crest length L=216.0 m;
- Auxiliary dam : two- zones earthfill dam , Crest length L=326.0 m;
- Flood spillway : Spillway width Bweir =38.0 m, number of chambers 3 , width of each chamber 9.0 m, spillway crest elevation 604.0
- Pressure tunnel:
- Inner diameter of vertical tunnel: 3.0/2.6 m
- Cross-section size (bxh/D): 3×3.4/2.6 m
- Total length: 1335.0 m
- Hydropower plant : open type
- Number of units: 02×75 MW
- Turbine type (Vertical Francis):
- Plant dimensions (BxLxHxh)m – (40×28.3×26.1×15.7)m
Total investment amount/Construction : 1,798 billion VND (2008)
Contract amount: 5.726.000.000 VNĐ
Duration : 2008÷2010