Client: Hydraulic Project Investment and Construction Management Board 8
Location: EaKar & Krong Pach District, Dak Lak Province
Objectives and Tasks:
- Water supply for irrigation for 14,900 hectares of agricultural land
- Water supply for domestic use for about 72,916 people and livestock
- Flood mitigation, and waterlogging prevention for lowland areas
- Aquaculture, creating tourist landscapes and improvement of regional climate.
Main technical specifications
- Grade of works: grade II (TCXDVN 285:2002)
- Capacity: 123.00x 10 6 m³
- Earth Dam No.1: height H max = 38m; Earth Dam No.2: height H max = 30m
- Flood spillway 1: gated spillway, Design discharge Q design= 1,183m³/s; n x B=3 x 10m
- Flood spillway 2: free spillway, Design discharge Q design = 168m³/s; B=70m
- Water intake 1: Q design = 14.04 m³/s
- Water intake 2: Q design = 2.16 m³/s
- Canal system: length L=47,300m, Q design = 14.04 m³/s
Total investment amount : 4,420 billion VND
Duration:
- Commencement year: 2011
- Completion: 2023