Client:
- Irrigation Project Management Board 418 (Now Hydraulic Project Investment and Construction Management Board 10)
Location: Cang Long district, Tra Vinh province
Tasks of Works
The major work of the South Măng Thít irrigation project together with other projects with the following tasks:
- Saline prevention, retaining fresh water, creating fresh sources, drainage, deacidification, alkaline washing, and land reclamation for 177,792 hectares of natural land, in which 267,000 hectares for farmland. Where Láng Thé sluice directly prevents salinity, creating fresh sources for 26,650 hectares, and drainage for 31,140
- Water supply for domestic use for people area.
- Combine the development of waterway and road traffic and improve the ecological environment of the project area.
Main technical parameters
- Grade of Works: I
- Sluice: open gate type made of reinforced concrete includes 10 chambers, B= 10x10m = 100m
- Automatic two-way valve gate made of stainless steel
- Traffic bridge load capacity HL18-X80, reinforced concrete structure M300 includes 12 beam spans, bridge length L = 150m.
- Length of upstream canal of 733m, the length of downstream canal = 903m, width of bottom B bottom = 125m
- Homogeneous earth dam backfilling into water, length of dam L = 200m, maximum height Hmax = 16.5m
Total investment amount/Construction cost: 103,129 billion VND (2003)
Contract amount: 2,450,920,000 VND
Duration: 2000 ÷ 2002
- Commencement: 2003
- Completion: 2004