

Client :
- Project Management Board for Agricultural and Rural Development Projects in Binh Thuan Province – Department of Agriculture and Rural Development of Binh Thuan Province
Location :
Ham Thanh commune – Ham Thuan Nam district, Binh Thuan province
- Irrigation project for 4,670 hectares of farmland for Ba Bau irrigation area, including: South canal irrigation area 2,700 hectares, West canal irrigation area 1,970 hectares. At the same time, it regulates the lowering of flood peaks to reduce flooding for the downstream area of Móng River and improves the climate and environment of the project area during the dry season. It provides domestic water for water plants in the district and serves the production and domestic water source for industrial parks and residential areas under construction.
- Grade of Works : III
- Reservoir capacity: 37,2×106 m3
- Dam : Homogeneous earth dam, height of dam Hmax=26.9 m, length of dam 632 m.
- Sluice: sill elevation +38,5 m.
- Water intake: BxH 2(2×3)cm.
- Design discharge through sluice: Q = 15.0 m3/s.
- Spillway width: B spillway= 54,2 m.
- Design discharge through spillway: Q spillway = 210 m3/s.
- Total investment amount/Construction cost: 207,9 billion VNĐ
Duration :
- Commencement: 2007
- Completion: 2011