




Client:
- Hydraulic Project Investment and Construction Management Board 8
Location:
- Ea H’leo commune, Ea H’leo district, Dak Lak province
Tasks of Works:
- Water supply for irrigation for 5,000 hectares of agricultural land
- Water supply for industrial and domestic use of 10,000 people with Q=15,000 m³/day-night
- Water supply 1,000,000 m³/year for livestock
Main technical parameters
- Grade of works: grade II
- Storage capacity: 25.21 x 10 6 m³
- Main dam: concrete gravity dam, H max = 59m, L = 312m;
- Earth dam: H = 16m, L = 305m.
- Spillway : free spillway combined with valve gate; Qdischarge = 637.8 m³/s; B = (40+8)=48m
- Water intake : Q design = 2.28 m³/s
Construction cost: 605,284,714,000 VND
Execution time: Completion in 2021