Client :
- Project Management Board for Agricultural and Rural Development Projects in Ba Ria – Vung Tau Province
Location :
- Districts: Châu Đức, Long Điền, Đất Đỏ và Xuyên Mộc in Bà Rịa-Vũng Tàu Province.
Tasks of Works
- The project irrigates 9,357 hectares of farmland in the districts of Chau Duc, Long Dien, Dat Do and Xuyen Moc and supplies 535,000 m³/day of domestic water in Ba Ria-Vung Tau province.
Main technical parameters
- Grade of Works : Grade III
- Reservoir capacity: 37,2×106 m3
- Dam : Homogeneous earth dam, height of dam Hmax=26.9 m, length of dam 632 m.
- Sluice sill elevation: +38,5 m.
- Water intake: BxH 2(2×3)cm.
- Design discharge through sluice: Q = 15.0 m3/s.
- Spillway width: B spillway= 54,2 m.
- Design discharge through spillway: Q spillway = 210 m3/s.
- Total investment amount/Construction cost: 789 billion VNĐ
Duration :
- Commencement: 2007
- Completion: 2011