Client:
- Hydraulic Project Investment and Construction Management Board 9
Location:
- Chau Duc & Xuyen Moc District, Ba Ria – Vung Tau
Tasks of Works:
- Water supply for irrigation 9,357 hectares of agricultural land.
- Water supply for industry and domestic use within the industrial park along National Highway 51 and Vung Tau city at 500,000m³/ night-day, and for Xuyen Moc district at 35,000m³/night-day.
- Preventing floods and salinity intrusion for 400 hectares of agricultural land and for 100 hectares of aquaculture in Dat Do district.
- Discharge for exhausted water restoration for environment protection for Ray River at Q= 2,0m3/s
- Development of rural transport, tourism and freshwater aquaculture.
Main technical parameters:
- Grade of Works: III (TCXDVN 285-2002)
- Storage capacity: 215*10 6 m³
- Main dam: homogeneous earth dam, height of dam Hmax = 34 m
- Spillway: Q design = 2,461 m³/s; B=3x11m
- Water intake: Q design = 20 m³/s
Total investment amount:
- 2,626 x109 VND ( in which construction cost is 1,368 billion VND?
Duration:
- Commencement: 2005
- Completion: 2013