Client:
+ Hydraulic Project Investment and Construction Management Board 4
Location: Vu Quang district, Ha Tinh province
Tasks of Works:
- Exploiting Thạch Khê iron mine with flow Q=6.0m3/s and other industrial parks.
- Irrigation for 32,585 hectares of agricultural land;
- Aquaculture 5,991 hectares (fresh water 3,500 hectares and brackish water 2,491 hectares).
- Power generation N = 15 MW.
- Water supply for other industries and people’s livelihoods; reduce floods and improve the lowland ecological environment (with flow Q=4.0 m3/s); tourism development.
Main technical parameters
- Grade of Works: II (Standard TCXDVN 285:2002)
- Capacity: 775×10 6 m³
- Main dam: Multi-block earth and rock dam; Height of dam Hmax= 53.9m; length of dam peak L = 342m;
- Spillway: Practical Ophixerov cross-section; Number of spillways: 05
- Water intake No. 1: irrigation water supply with a flow rate Q = 56.8 m 3 /s, ensuring the environment with a flow rate Q = 4.0 m 3 /s for combined power generation; Construction diversion with maximum flood flow about Q = 610 m 3 /s.
- Diversion tunnel, flood discharge during the construction phase and used as inspection and repair corridors during exploitation management; Tunnel diameter D = 7.0m;
- Water intake No. 2: Irrigation water supply with Design discharge Q design = 8.86 m 3 /s for Huong Son and Vu Quang canals.
- Hydroelectric power plant:
- Number of units: 03
- Installed capacity: 15 MW
Total investment amount/Construction cost: 1,938 billion VND (2008)
Contract amount: 2,502,000,000 VND
Duration: 2009 ÷ 2017