Client:
- Hydraulic Project Investment and Construction Management Board 10
Location: Vinh Long Province
Objectives and Tasks
- Along with other items in the subproject on water source control and climate change adaptation.
- Control salinity and high tides, creating clean water sources, drainage, and land reclamation for nearly 30,000 hectares of natural land.
Main technical specifications
- Grade of works: grade II
- Sluice: Open type includes 03 independent chambers B=(3×25)=75m
- Clape valve gate operated by the lower shaft
- Traffic bridge with load capacity HL93, B=6m, including 09 spans.
- Embankment of both banks using prestressed reinforced concrete piles SW600B
- Construction methods by Larsen piles IV
Total investment amount/Construction cost: 238 billion VND ( Viet Nam government and WB loan)
Duration: 2018 ÷ 2020