


Client:
Irrigation Project Management Board 418 (Now Hydraulic Project Investment and Construction Management Board 10)
Location: Binh Dai and Ba Tri districts, Ben Tre province
Tasks of Works
- Saline prevention, retaining fresh water, creating fresh water sources, drainage, deacidification, alkaline washing, and land reclamation for 115,000 hectares of natural land, of which 88,500 hectares of farmland.
- Supply water for domestic use for people in Chau Thanh, Giong Trom districts, Ben Tre city.
- Combine the development of waterway and road traffic and improve the ecological environment of the project area
Main technical parameters
- Grade of Works: I
- Sluice: open gate type made of reinforced concrete includes 10 chambers, B=(2×10+8×8)m = 84m
- Automatic two-way valve gate made of stainless steel
- Traffic bridge with loading capacity HL93, reinforced concrete structure M300 includes 12 girder spans, length of bridge L = 141m.
- The up & down stream canals with width of bottom Bbottom = 108m; length L = 1,618m.
- Homogeneous earth dam backfilling into water, length of dam L = 544m, maximum height Hmax = 12.5m
- The connecting road is 1,163m long, connecting two districts: Binh Dai and Ba Tri
Total investment amount/Construction cost: 83.3 billion VND (2000)
Contract amount: 1,651,277,000 VND
Duration: 2000 ÷ 2002
- Commencement: January 27, 2000
- Completion: April 30, 2002